Everything went well with the install yesterday. The torque arm still needs a little adjusting, as it hopped just a tiny bit at first. Installed the SLP Line lock at the same time and then painted a couple of stripes in the parking lot to test the new mods out. Much better than my last sideways launch. These additions kept it straight as an arrow. Don Goetz knows his stuff when it comes to fabrication and welding. Everything bolted in perfectly and was easy to adjust.